Hickman Road Bridge Seismic Replacement (HBP Funded)

Duration

2007 – 2021

Total Project Cost

$25M

Replacement over the Tuolumne River, addressing seismic safety concerns for a scour-critical foundation. The project faced significant challenges, including high groundwater conditions and environmental issues like nesting birds. Through close collaboration with Dewberry (formerly Drake Haglan & Associates), Crawford & Associates, and Dokken Engineering, Brady ensured the project stayed on track, overcoming geotechnical and environmental hurdles with swift communication and effective coordination. This effort led to the successful completion of a critical environmentally safe infrastructure upgrade.